Estimate Your Grading & Leveling Cost

Adjust the sliders, pick a grading type, and toggle excavation add-ons — your estimate updates instantly.

50 ft
10 ft50100150200 ft
40 ft
10 ft50100150200 ft
Moderate
MinorModerateSteepSevere

Minor = small low spots or pooling. Severe = significant elevation changes requiring heavy equipment and hauling.

Finish Grading — $1 – $2 / sq ft
Rough Grading — $1.50 – $3 / sq ft
Regrading (Drainage Correction) — $2 – $4 / sq ft
Cut & Fill Excavation — $3 – $6 / sq ft
Lot Clearing + Grading — $4 – $8 / sq ft

Estimated Cost Range

$2,875$5,750

$1.44 – $2.88 per sq ft

Site Area

2,000 sq ft

Grading Type

Finish Grading

Slope

Moderate

Add-Ons

None

Est. Soil Moved

15 cu yd

Equipment Hours

13 hrs

Truck Loads

2 loads

Cleveland clay soil note: Northeast Ohio's heavy clay increases excavation time by 15–30%. This estimate accounts for typical clay conditions. Actual costs depend on site access, underground utilities, and soil moisture content at time of work.

Get Your Free Site Assessment →